During time of products research and design, Greenawn makes rigorous analysis and comparison base on market demands, comments from customers and sales. The R&D team would make continuous testing and study on latest raw material and innovative technology in order to design more suitable products for meeting customers’ demands through a lot of data analysis.

 

The 90 MW PV Power Generation Project of Jinko Power in Xinyuan County, Ili Prefecture, Xinjiang Autonomous Region

The project is furnished with a 5.308 MWh energy storage system comprising 2 2.654 MWh battery energy storage containers and 1 35 kV/2.5 MVA energy storage conversion boost system. Each battery energy storage container unit is composed of 16 165.89 kWh battery cabinets, junction